MCPShow me the worst TSS violators in my state, ranked by frequency.Learn more

Tibatek GmbH

www.tibatek.de+49 2861 929491-0info@tibatek.deHohe Oststraße 54, 46325 Borken, Germany
manufacturer

About

TIBATEK GmbH, founded in 2016 and based in Borken, Germany, is a civil engineering equipment manufacturer spun off from the construction firm Klaus Stewering GmbH & Co. KG after development of its flagship Flüssigbodenschaufel in 2015. Part of Firmengruppe Stewering, the company designs, manufactures, rents, and sells specialized equipment for underground pipeline, sewer, and utility trench construction. The centerpiece product line is the Flüssigbodenschaufel (FBS) fluid-soil shovel — an excavator attachment that mixes excavated soil with compound and water directly on-site to produce ZFSV fluid soil for pipeline bedding and trench reinstatement. It comes in three sizes: FBS 800 (0.8 m³, 16 t excavators), FBS 1000 (1.0 m³, 20 t excavators), and FBS 2000 (2.0 m³, 35 t excavators), paired with the Flüssigboden-Compound additive for load-bearing, root-resistant, gas-permeable backfill. The Dosiermaster is a hydraulic dosing bucket for precise placement of concrete, fluid soil, and semi-liquids (consistency classes F4–F6), operable by one person from the excavator cab. The Rohrmaster handles loading, transporting, and laying reinforced concrete pipes from 400–1,200 mm inner diameter (600–4,500 kg). The Schachtmütze (model SW10003) is a 87 kg steel shaft cap protecting manholes up to DN 1500 during backfilling. The Verbauzieher trench shoring puller (2.4 t self-weight, 16 t minimum excavator) removes shoring panels without manual effort. Additional products include Absturzsicherung fall-protection barriers, Böschungsleitern slope ladders, Spundwandleitern sheet-pile ladders, Kettenständer chain hanger stands, and Schnellwechsler hydraulic quick-coupler systems.

Key Products

Flussigbodenschaufel FBS 800/1000/2000

Excavator attachment that mixes excavated soil with compound and water on-site to produce fluid soil (ZFSV) for pipeline bedding and trench backfilling in water/sewer construction

Flussigboden-Compound

Environmentally-friendly compound additive for fluid soil that provides load-bearing capacity, root resistance, gas permeability, and thermal conductivity in trench reinstatement

Dosiermaster

Hydraulic dosing bucket for precise placement of concrete, fluid soil, insulation material, and other semi-liquid materials (consistency classes F4-F6) in pipeline and utility construction

Rohrmaster

Universal pipe-laying device for loading, transporting, and laying concrete steel pipes in water and sewer pipeline construction

Schachtmutze (Shaft Cap)

Heavy-duty steel cap for covering manholes and shafts up to 1500mm diameter during backfilling to prevent damage

Verbauzieher (Trench Shoring Puller)

Excavator attachment for installing and removing trench shoring panels during utility and sewer line construction

Absturzsicherung (Fall Protection)

Steel post barrier system for securing pit and shaft edges to prevent falls during construction

Böschungsleiter (Slope Ladder)

Access ladder for slopes from 45-89 degrees, suitable for pits up to 1.7m deep in pipeline construction

Spundwandleiter (Sheet Pile Ladder)

Ladder for sheet piling installations, 2-10 meters, hung into sheet piles by excavator for worker access in trench work

Kettenständer KS12 & KS24

Chain hanger stands for organized storage of chain slings on construction sites

Schnellwechsler (Quick Coupler)

Hydraulic quick-coupler system for rapid attachment changes on excavators in construction applications

Is this your company?

Claim this listing to update your information and feature your products.

Claim This Listing
Municipal Compliance Pipeline

Do you know where your next client is? We do.

Violations, consent orders, full historical DMR data, plant details and rankings for every regulated facility — searchable with a smart AI interface.

Built for
Consulting Engineers
Consent orders and DMR exceedances are projects waiting for design help.
Contract Operators
Plants in violation need operations assistance — know who they are.
Manufacturers
See the upgrade signals before the RFP hits the street.
Equipment Reps
Target customers by process line, filtered to your territory.
Consulting Engineers
Consent orders and DMR exceedances are projects waiting for design help.
167,000+
Facilities tracked
Full
Historical DMR data
AI
Smart search interface
MCP — Municipal Compliance Pipeline
Water · Wastewater · Industrial
Find Your Next Client →See how MCP works