Tibatek GmbH
About
TIBATEK GmbH, founded in 2016 and based in Borken, Germany, is a civil engineering equipment manufacturer spun off from the construction firm Klaus Stewering GmbH & Co. KG after development of its flagship Flüssigbodenschaufel in 2015. Part of Firmengruppe Stewering, the company designs, manufactures, rents, and sells specialized equipment for underground pipeline, sewer, and utility trench construction. The centerpiece product line is the Flüssigbodenschaufel (FBS) fluid-soil shovel — an excavator attachment that mixes excavated soil with compound and water directly on-site to produce ZFSV fluid soil for pipeline bedding and trench reinstatement. It comes in three sizes: FBS 800 (0.8 m³, 16 t excavators), FBS 1000 (1.0 m³, 20 t excavators), and FBS 2000 (2.0 m³, 35 t excavators), paired with the Flüssigboden-Compound additive for load-bearing, root-resistant, gas-permeable backfill. The Dosiermaster is a hydraulic dosing bucket for precise placement of concrete, fluid soil, and semi-liquids (consistency classes F4–F6), operable by one person from the excavator cab. The Rohrmaster handles loading, transporting, and laying reinforced concrete pipes from 400–1,200 mm inner diameter (600–4,500 kg). The Schachtmütze (model SW10003) is a 87 kg steel shaft cap protecting manholes up to DN 1500 during backfilling. The Verbauzieher trench shoring puller (2.4 t self-weight, 16 t minimum excavator) removes shoring panels without manual effort. Additional products include Absturzsicherung fall-protection barriers, Böschungsleitern slope ladders, Spundwandleitern sheet-pile ladders, Kettenständer chain hanger stands, and Schnellwechsler hydraulic quick-coupler systems.
Key Products
Excavator attachment that mixes excavated soil with compound and water on-site to produce fluid soil (ZFSV) for pipeline bedding and trench backfilling in water/sewer construction
Environmentally-friendly compound additive for fluid soil that provides load-bearing capacity, root resistance, gas permeability, and thermal conductivity in trench reinstatement
Hydraulic dosing bucket for precise placement of concrete, fluid soil, insulation material, and other semi-liquid materials (consistency classes F4-F6) in pipeline and utility construction
Universal pipe-laying device for loading, transporting, and laying concrete steel pipes in water and sewer pipeline construction
Heavy-duty steel cap for covering manholes and shafts up to 1500mm diameter during backfilling to prevent damage
Excavator attachment for installing and removing trench shoring panels during utility and sewer line construction
Steel post barrier system for securing pit and shaft edges to prevent falls during construction
Access ladder for slopes from 45-89 degrees, suitable for pits up to 1.7m deep in pipeline construction
Ladder for sheet piling installations, 2-10 meters, hung into sheet piles by excavator for worker access in trench work
Chain hanger stands for organized storage of chain slings on construction sites
Hydraulic quick-coupler system for rapid attachment changes on excavators in construction applications
Is this your company?
Claim this listing to update your information and feature your products.
Do you know where your next client is? We do.
Violations, consent orders, full historical DMR data, plant details and rankings for every regulated facility — searchable with a smart AI interface.